Skip Ribbon Commands
Skip to main content
  
  
  
Body
Unresolved
  
10/15/2014 12:21 PM

 

When standing under the overhang on the west entrance (north of the IT rooms) it’s been reported there’s a bad leak.

Unresolved
  
10/15/2014 12:12 PM

Per my last update these were drywalled over and the cable were up above the ceiling, however, we do plan to do an installation by year end and rather than calling electrical and data contractors back out to the site ask these boxes be made ready.  Please compelte  the power, on theleft (when looking into the library). 

Unresolved
  
10/15/2014 12:20 PM

Terri reported on the day of the storm there was a loud, whistling coming from the windows in that area. 

Unresolved
  
10/15/2014 12:20 PM

Are downspouts emptying onto walkways? 

Unresolved
  
10/15/2014 12:20 PM
In middle of counter in the receiving area
Unresolved
  
10/16/2014 9:06 AM
Counter
Unresolved
  
10/15/2014 12:19 PM
When will it be installed and outlets look at wrong height
Unresolved
  
10/15/2014 12:17 PM
Need to correct ground for city it room pulled
Unresolved
  
10/15/2014 12:12 PM
Cabling used for it room groundnuts (looks like temp cable installed)
Unresolved
  
10/15/2014 12:13 PM

Per our review of the computer tables – best solution would be to be end panels on all the tables

Unresolved
  
10/15/2014 12:14 PM
Issue, 2012.19-HPLDE-Riverside Library & Cultural Center, High Plains Library District

New Punch list items:

Location in Library: partition wall north of the service desk – behind counter holding the 3 computers (reservation station, print release stations)

·         Outlets for power where computers are supposed to be plugged in are taped-over and missing face plates.

·         East-most power outlet – gap in wall (assume faceplate will cover) – however, sticks out beyond the cabinetry. Doesn’t look right.

·         Baseboard does not meet-up with the cabinetry on either east or west side.

·         Part of cabinet baseboard (kickboard?) not yet affixed to rest of cabinet

 

From: Brielle Ratkai [mailto:noreply@owner-insite.com]
Sent: Tuesday, October 07, 2014 12:52 PM
To: Elena Rosenfeld; Brielle Ratkai
Subject: Re: 2012.19-HPLDE-Riverside Library & Cultural Center Punchlist Item #2

 

-- Reply ABOVE THIS LINE -- (^28f1a471-f186-417c-81a2-7d34331cac8e)

You have been requested to comment on the following Document:
Click here to view

 

Punch List #2

Status:Open

10/07/2014   

 

Summary

 

Ball In Court:

Darrel Miller

Created By:

Brielle Ratkai

Priority:

High

Project:

2012.19-HPLDE-Riverside Library & Cultural Center

Due Date:

Completed On:

Categories:

Approved/Verified On:

Associated Doc:

 

Detailed Description

Owner and Architect Punch Walk-Interior Building

This includes Owner Comments, General Notes from both Roth Sheppard, Wember, High Plains and City of Evans.

There are a couple of items that are incomplete.  We would like a timeline of when those will be installed.

Please complete these ASAP.  Let us know if you have any further questions.

         



Change Proposal Request

Will this Issue have a cost impact?

( )Yes

(X)No

Will this Issue have a time impact?

( )Yes

(X)No

Comments

From: Elena Rosenfeld | Assoc Director Public Services | High Plains Library District

10/7/2014 12:52:18 PM

COMMENT REQUESTED    

From: Keith Emrick | Project Engineer | FCI Constructors, Inc.

10/7/2014 12:51:58 PM

COMMENT REQUESTED    

From: Jeremy Blubaugh | Engineer | FCI Constructors, Inc.

10/7/2014 12:51:45 PM

COMMENT REQUESTED    

From: Chad Racine | Project Manager | FCI Constructors, Inc.

10/7/2014 12:51:18 PM

COMMENT REQUESTED    

From: Darrel Miller | Superintendent | FCI Constructors, Inc.

10/7/2014 12:51:05 PM

COMMENT REQUESTED    

From: Brian Stone | City of Evans

10/7/2014 12:49:17 PM

COMMENT REQUESTED    

From: Dan Spykstra | Project Manager | Wember

10/7/2014 12:49:05 PM

COMMENT REQUESTED    

 

Approvers

Brielle Ratkai

 

Wember

 

Attachments

 

Date

File Name

Uploaded By

Version

Folders

Categories

 

icon10/07/2014

HPLDE-2014.10.06 Owner-Arch Punch Walk.pdf

thumbnail
(16559.87 KB)

Brielle Ratkai
Issue - Punch List #2

1

icon10/07/2014

HPLDE-2014.10.06 Riverside and Cultural Center Interior Owner-Arch Walk.xls

(112 KB)

Brielle Ratkai
Issue - Punch List #2

1

×

Video

Close

 

Unresolved
  
10/15/2014 12:13 PM

 

Unresolved
  
10/15/2014 12:13 PM

 

 
 
 
Unresolved
  
10/16/2014 9:21 AM

there is a poweer cord hanging down the middles of all those tables.  Looks really bad and see if getting pulled, people getting in their feet.   Need better solution.​

Unresolved
  
10/16/2014 9:24 AM

to the wall to the left of where the announcement board​ has been installed.   announcement board will need to be repaired.

In Process
  
10/15/2014 12:22 PM

Let me know what of these items can be taken care of asap. 

 

Required

1.     DONE -   Grommets drilled in the main service desk counters

2.      DONE -  Access to the  power/data floorbox on the back side of the main service desk

3.      Done -  Counter top installed for the computers to support the main computer desk

4.       Cable trays under the main computer tables (this wouldn’t prohibit us from opening but this will be a pain to try to manage otherwise  

 

Would be preferred

 

5.       Fix the height of the computer tables

7.       Cuts and removal of floorboxes under the main computer banks

 

Completed
  
10/15/2014 12:09 PM

I heard there was a data port needed for the detection gates. 

Completed
  
10/15/2014 12:19 PM
Cash register area need access to power and data box
Completed
  
10/15/2014 12:21 PM

Were told there would be a plate we’d have to remove but see now it’s been screwed into place  - can’t access port or ports

Abandoned
  
10/16/2014 9:06 AM
In room 106
Abandoned
  
10/15/2014 12:20 PM
Data ports in room 104
Abandoned
  
10/16/2014 9:07 AM

Abandoned
  
10/16/2014 9:05 AM

abondon this.  HPLD will manager any further needs at a later time.​